The Green Hills Hoyts Cinema Project consisted of 2500m2 of Lysaght Spandek Cladding, 1000m2 of Custom Orb Cladding and 800m2 of Custom Orb Cladding to the feature blade walls.
The blade walls feature double raked cut Sheeting to the corner of the Cinema box, another nice feature of the blade walls was the custom fabricated flashings to the sides and underside of the blades which provide some nice visual lines rather than a flat angled flashing.
The top hat framing was installed to the rake the walls this ensured the screw lines looked the piece as they followed all the raked cuts and flashings.
Client Multiplex
Sector Commercial
State NSW